A 8x8 slab at 4" needs 40 bags of 80 lb concrete.

40bags

80 lb bags · estimated $279.20 at $6.98/bag

Advertisement placeholder (ad-slot-1)

Estimated cost: ~$279.20 (40 × $6.98/bag, Spring 2026 pricing)

Quick presets

Bag size

Material list

  • 40 × 80 lb concrete mix bags $279.20 @ $6.98/bag (Spring 2026)Home Depot ↗Lowe's ↗
  • Wheelbarrow or mixing tub
  • Mixing hoe or drill paddle
  • Margin trowel or float
8 ft (W)8 ft (L)4 in (T)

Multi-bag comparison

Bag sizeBagsPrice/bagTotal
80 lbBest value40$6.98$279.20
60 lb53$5.98$316.94
40 lb79$4.98$393.42

Prices are spring 2026 estimates. Above ~60 bags, price a ready-mix truck too — it is often cheaper.

Advertisement placeholder (ad-slot-2)
40 bags(80 lb)
$279.20
Buy at Home Depot

How this is calculated

We convert your dimensions to cubic feet, add a 10% waste buffer for spillage and an uneven subgrade, then divide by the bag's yield and round up to the next full bag.

FAQ

How many bags of concrete for a 8x8 slab?

A 8x8 slab at 4 inches needs about 40 bags of 80 lb or 53 bags of 60 lb concrete, including a 10% waste allowance.

How much does a 8x8 concrete slab cost?

About $279 in 80 lb bags at current prices.

How many cubic feet of concrete is a 8x8 slab at 4 inches?

About 21.3 cubic feet, or 23.5 cubic feet once the 10% waste buffer is added.